web analytics
Categories
completed works

Urban centre Ribnica

Ribnica can be proud that in economically and socially challenging times it has managed to build a facility that increases the sustainability of society not by increasing the number of weapons or building retaining walls, but by culture and intergenerational inclusion. The vast majority of Slovenian settlements are experiencing their spatial development at the expense […]

Categories
competition proposals

Iris Centre for Blind and Visually Impaired Children in Ljubljana

A space where architecture becomes a tool for equality – created for those who experience the world differently In the competition proposal for the IRIS Centre, the team made a conscious decision to reinterpret some of the competition requirements, in particular the stipulation that the residential home must be located in an existing listed building. […]

Categories
news

DARS Grič office building receives prestigious Architizer A+ Award in the Sustainable Office Buildings category

Ljubljana, June 2025 – The DARS Grič office building project, built in 2025, has been awarded the International Architizer A+ Award Winner in the Sustainable Commercial Building category. The award acknowledges the project’s outstanding contribution to the development of modern and sustainable commercial architecture and is an important recognition of Slovenian expertise, design and execution. […]

Categories
completed works

DARS Business Centre

The buildings designed and built over the last 80 years, since the end of the Second World War, can be broadly divided into two main groups. The first includes buildings where the load-bearing structure is retreating from the edge of the building envelope into the interior, and the second includes buildings where the building envelope […]

Categories
under construction

Construction of the Ribnica Intergenerational Sports and Cultural Centre

Construction is being carried out by Riko, d.o.o. The design is being carried out in consortium with EFEKT arhitektura, d.o.o. March 2024 Over the winter, the contractor completed the construction of the basic structure. The final footprint of the planned cultural centre is defined and clearly visible in space. The two main height dominants, the […]

Categories
under construction

Construction of the DARS office building in Grič

The construction company CGP, Novo Mesto has taken over the execution of all works of the DARS office building in Grič, Ljubljana. Construction was monitored from September 2022 to October 2024. The work carried out is presented on a separate website. September 2024 Construction work on the exterior is complete, followed by landscaping, laying of […]

Categories
completed worksnews

Production plant in Ribnica

The geometry of global and local economies intertwined in a combination of concrete and wood The economic boom of the first decade of the 21st century. In the last century, in close connection with an expansive and poorly controlled spatial policy of expansion of production and craft areas in medium-sized settlements along motorways and regional […]

Categories
completed works

Business premises in Krško

With simple space measures, we have transformed what were once dark offices into a vibrant working environment. The key challenge of the renovation project was to provide a transparent, relatively bright, yet individualised working environment for the engineers of a large company in Krško. The renovated premises are located in a very deep, unused industrial […]

Categories
competition proposals

Cultural and sports centre in Ribnica

The alternative solution of the competition project – which complements the client’s brief – proposes to move stationary traffic almost entirely underground, which significantly improves the quality of the city-forming urban open spaces. In terms of programme and volume, the MŠK buildings dominate their surroundings. A new cultural and sports centre is created, with an […]

Categories
competition proposals

Department of the Faculty of Biotechnology, UL

The open floor plan with a perimeter structure without any intermediate supports is fully adaptable to changing technological and laboratory requirements. The new wing of the Faculty of Biotechnics creates a new open public space, surrounded on three sides, defined on the one hand by the design and function of the existing buildings, and on […]