Construction is being carried out by Riko, d.o.o. The design is being carried out in consortium with EFEKT arhitektura, d.o.o. March 2024 Over the winter, the contractor completed the construction of the basic structure. The final footprint of the planned cultural centre is defined and clearly visible in space. The two main height dominants, the […]